-
Peter Higgs posted an update in the group
Terra Linna maintenance 4 years, 9 months ago
Although the mast has been re-stepped with a great deal of work and effort, there are a number of things left to complete before she can be sailed so lets not drop the ball just yet! But it has been a great effort, well done!
To do;
1. re – fit the bow sprit
2. re – fit the boom and gaff
3. Fabricate and install a shoe to the base of the mast at…[Read more] -
Peter Higgs posted a new activity comment 4 years, 9 months ago
A nice capture in time David
-
Peter Higgs posted an update in the group
Terra Linna maintenance 4 years, 10 months ago
We also have the mast and other spars out of Terra Linna so Peter Dempsey and Bernard Chenery are leading the restoration and maintenance of this work with great assistance by Andrew Perkins (APCO engineering). Currently the mast is under repair before oiling of the same occurs. All spars are stripped right back to bare wood and other than the…[Read more]
-
Peter Higgs joined the group
Terra Linna maintenance 4 years, 10 months ago
-
Peter Higgs joined the group
Cornelia restoration 4 years, 10 months ago
-
Peter Higgs wrote a new post 6 years, 6 months ago
Norglass Paints and Speciality Finishes has kindly sponsored the marine paints and finishes for our circa 1880 yacht Terra Linna during the restoration and since the re-launch in 2012. The Wooden Boat Guild […]
-
Peter Higgs wrote a new post 7 years, 6 months ago
APCO EngineeringAPCO Engineering have been very generous to the Wooden Boat Guild of Tasmania Inc. They have hosted the Guild at their Marine E […]